Building a home in Oman is an exciting journey, but it requires careful planning—especially in a climate known for extreme heat, sandstorms, and humidity. This guide walks you through each stage of construction, with a detailed checklist of materials and tips on sourcing them efficiently from Surbahla, Oman’s trusted supplier for quality building supplies.


Stage 1: Planning & Permits

Before breaking ground, secure approvals and finalize your design.
Key Tasks:

  • Obtain permits from your municipality.
  • Hire an architect/engineer familiar with Omani building codes.
  • Plan for climate-specific features: shaded windows, thermal insulation, and wind-resistant roofing.

Materials Checklist:

  • Not required yet, but start researching suppliers for later stages.

Surbahla Sourcing Tip:
Visit Surbahla’s showroom or website to explore material options early. Their team can advise on cost-effective, climate-friendly solutions.


Stage 2: Site Preparation

Clear and level the land to create a stable base for construction.
Key Tasks:

  • Remove debris, rocks, and vegetation.
  • Level the ground and set up temporary access roads.
  • Install fencing for security.

Materials Checklist:

  • Gravel: For temporary pathways (OMR 10–15 per ton).
  • Sand: For leveling (OMR 5–8 per ton).
  • Concrete: For boundary markers.

Surbahla Sourcing Tip:
Buy gravel and sand in bulk from Surbahla to save costs.


Stage 3: Foundation

A strong foundation is critical to withstand Oman’s soil and weather conditions.
Key Tasks:

  • Excavate trenches for footings.
  • Pour concrete and install steel reinforcements.
  • Waterproof the foundation to prevent moisture damage.

Materials Checklist:

  • Concrete: For footings and slabs (OMR 20–25 per cubic meter).
  • Steel Rebars: Epoxy-coated for rust resistance (OMR 50–80 per bundle).
  • Waterproofing Membrane: To protect against groundwater (OMR 15–25 per roll).

Surbahla Sourcing Tip:
Surbahla supplies certified rebars and high-strength concrete mixes ideal for Oman’s soil.


Stage 4: Structural Framing

Build the skeleton of your home using columns, beams, and slabs.
Key Tasks:

  • Erect steel or reinforced concrete columns.
  • Install load-bearing beams and floor slabs.

Materials Checklist:

  • Steel Beams/Columns: For structural support (OMR 100–200 each).
  • Concrete Blocks: For infill walls (OMR 0.5–1 per block).
  • Binding Wires: To secure rebars (OMR 2–5 per kg).

Surbahla Sourcing Tip:
Surbahla’s pre-fabricated steel frames speed up construction and reduce labor costs.


Stage 5: Walls & Roofing

Enclose the structure with walls and a weather-resistant roof.
Key Tasks:

  • Lay concrete blocks or bricks for walls.
  • Install insulation and roofing materials.

Materials Checklist:

  • Concrete Blocks: Medium-density for thermal insulation (OMR 0.7–1.2 each).
  • Roofing Sheets: Insulated metal or clay tiles (OMR 5–15 per sqm).
  • Insulation: Foam boards or reflective foil (OMR 3–10 per sqm).

Surbahla Sourcing Tip:
Surbahla’s insulated blocks and solar-reflective roofing sheets keep interiors cool and cut AC bills.


Stage 6: Plumbing & Electrical

Install systems for water, electricity, and ventilation.
Key Tasks:

  • Lay pipes and wiring within walls.
  • Set up drainage and electrical panels.

Materials Checklist:

  • PVC/CPVC Pipes: For plumbing (OMR 1–3 per meter).
  • Electrical Wires: Heat-resistant copper wires (OMR 10–20 per roll).
  • Ducts: For HVAC systems (OMR 5–15 per meter).

Surbahla Sourcing Tip:
Surbahla stocks corrosion-resistant plumbing pipes and certified electrical supplies.


Stage 7: Interior Finishes

Transform the shell into a livable space with floors, walls, and fixtures.
Key Tasks:

  • Install flooring, plaster walls, and paint.
  • Fit cabinets, lighting, and doors.

Materials Checklist:

  • Ceramic Tiles: For floors and walls (OMR 2–8 per sqm).
  • Gypsum Boards: For ceilings (OMR 3–10 per sheet).
  • Low-VOC Paint: For walls (OMR 5–15 per gallon).

Surbahla Sourcing Tip:
Surbahla offers stylish tiles and eco-friendly paints in trendy colors.


Stage 8: Exterior Finishes

Protect and beautify the outer structure.
Key Tasks:

  • Apply weather-resistant paint or cladding.
  • Install windows and doors.

Materials Checklist:

  • Weather-Resistant Paint: UV-protective (OMR 8–20 per gallon).
  • Aluminum Cladding: For modern facades (OMR 10–25 per sqm).
  • Double-Glazed Windows: For heat insulation (OMR 50–150 each).

Surbahla Sourcing Tip:
Surbahla’s double-glazed windows reduce heat transfer by up to 50%.


Stage 9: Landscaping & Final Touches

Create outdoor living spaces and add finishing details.
Key Tasks:

  • Plant drought-resistant greenery.
  • Install outdoor lighting and pathways.

Materials Checklist:

  • Gravel/Decorative Stones: For gardens (OMR 10–20 per ton).
  • Solar Lights: For pathways (OMR 3–10 each).
  • Outdoor Tiles: Non-slip for patios (OMR 4–12 per sqm).

Surbahla Sourcing Tip:
Surbahla provides affordable landscaping materials, including gravel and outdoor tiles.


Stage 10: Final Inspection

Ensure your home meets safety and quality standards.
Key Tasks:

  • Schedule inspections with local authorities.
  • Fix any issues identified.

Materials Checklist:

  • Spare Tiles/Paint: For touch-ups.

Why Source Materials from Surbahla?

Surbahla simplifies the construction process with:

  • One-Stop Shopping: All materials under one roof—from foundation gravel to finishing paints.
  • Climate-Tested Quality: Products designed for Oman’s heat, sand, and humidity.
  • Competitive Pricing: Bulk discounts and price-match guarantees.
  • Expert Support: Free advice on material selection and quantities.


Ready to start your home-building project? Surbahla has everything you need, delivered on time and within budget!

📱 Chat with their experts today:
Click to WhatsApp or message +968 9538 7678 for a customized checklist.

Build smarter, faster, and stress-free with Surbahla—Oman’s partner for quality construction! 🏠✨

Leave a Reply

Your email address will not be published. Required fields are marked *